Normalization of Madiun Dawuhan Horn

  • 14th August 2023 WIB
Normalization of Madiun Dawuhan Horn
The officer operates heavy equipment for the dredging sediment at the Dawuhan reservoir, Madiun’s Kabupatan, East Java, (14/8/2023). The Large Hall of the River (BBWS) Bengawan Solo performs a mixture of reservoirs to normalize the capacity of reservoirs so it is expected to be able to increase the capacity of the water tampung as much as 230 thousand cubic meters from the current tampung power 3.9 million cubic meters. ANTARA PHOTO/Siswowidodo/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5000x3333
File size
1.77 MB
Created
14/08/2023 13:45 WIB
Photographer
Siswowidodo
Editor
Puspa Perwitasari