Drinking water treatment installation project in Malang
Workers connect iron pipes on drinking water treatment installation projects or Water Treatment Plant (WTP) in Pandanwangi, Malang, East Java, Friday (8/9/2023). The three-party cooperation project, the Tirta I Service Perumda and Tugu Tirta Perumda with an investment value of Rp74 billion, utilizing Bango river water to be processed into drinking water with a capacity of 200 lps (liter per second) and targeted by the end of 2023. ANTARA PHOTO/Ari Bowo Holypto/nym.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.