The development project of the Cirata Waduk

  • 12th September 2023 GMT+7
The development project of the Cirata Waduk
Workers are located at the site of the Solar Power Generation project (PLTS) Floating at Cirata reservoir, Cianjur Regency, West Java, Tuesday (12/9/2023). PLTS is floating in Cirata reservoir with 192 megawatt peak capacity (MWp) which is located in an area of 200 hectares and consists of more than 340 thousand solar panels and is able to produce 245 million kWh clean per year it will be inaugurated at 2023 coming by President Joko Widodo. ANTARA PHOTO/Raisan Al Farisi/hp.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5000x3328
File size
3.55 MB
Created
12/09/2023 16:40 WIB
Photographer
Raisan Al Farisi
Editor
Hermanus Prihatna