Sky Bridge development progress in Bogor Station

  • 9th October 2023 GMT+7
Sky Bridge development progress in Bogor Station
Workers complete the construction of the connecting layang bridge (Sky Bridge) between Bogor Station and the Paledang Station in Bogor City, West Java, Monday (9/10/2023). The Head of the Fireplace Engineering Hall (BTP) Bandung Chandrawan Adhiputranto declared the progress of the development of the Sky Bridge Bridge station Bogor-Stasiun Paledang Bridge has reached 65 percent with the target finished on December 2023 and began operating on January 2024. ANTARA PHOTO/Arif Firmansyah/nz

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5000x3333
File size
2.1 MB
Created
09/10/2023 13:45 WIB
Photographer
Arif Firmansyah
Editor
Zarqoni Maksum