PLTA Bili-Bili stops while operating due to dry

  • 23rd November 2023 GMT+7
PLTA Bili-Bili stops while operating due to dry
Water Power Generation (PLTA) Bili-Bili that stops while operating in Gowa Regency, South Sulawesi, Thursday (23/11/2023). PLTA with a power of 19,5 megawatts (MW) stopped operating for the last two months due to the supply of water from the Bili-Bili dam on it shrinks drastically from the normal eight cubic meters per second to two cubic meters per second as the impact of the dry season separated the phenomenon of El Nino. ANTARA FOTO/Arnas Padda/Spt.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4892x3261
File size
2.95 MB
Created
23/11/2023 11:05 WIB
Photographer
Arnas Padda
Editor
Saptono