Skybridge Bojonggede immediately operates

  • 4th December 2023 GMT+7
Skybridge Bojonggede immediately operates
Head of Jabodetabek Transportation Management Agency (BPTJ) Suharto (center) accompanied by PT. KCI Broer Rizal (left) review Skybridge Bojonggede which will operate in Bojonggede, Bogor Regency, West Java, Monday (4/12/2023). BPTJ will conduct a 243 meter skybridge trial with a width of 3 meters connecting Bojonggede Station with Bojonggede Terminal starting Tuesday (5/12) to Friday (9/12) and will operate as well as inaugurated on Saturday (10/12), the presence of the skybridge can reduce the separating traffic conditions around Bojonggede Station. ANTARA PHOTO/Yulius Satria Wijaya/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5184x3456
File size
1.83 MB
Created
04/12/2023 15:50 WIB
Photographer
Yulius Satria Wijaya
Editor
Fanny Octavianus