The utilization of PLTS on the campus of the University of Malang State

  • 18th January 2024 GMT+7
The utilization of PLTS on the campus of the University of Malang State
Car riders cross near solar power generation panels (PLTS) in Malang State University, East Java, Thursday (18/1/2024). The campus is innovating by installing the installation of the Internet Based Power Of Thing (IOT) PLTS along 150 meters in two dots with a total capacity of 50Kwp consisting of 40 kwp connected to the PLN network (on-grid) and 10 kwp independent network (off-grid) with a power potential of 70 MWh per year so that in addition to being able to save electricity costs around Rp100 million per year can also be used as educational means for the students ANTARA FOTO/Ari Bowo Sucipto students.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3333x5000
File size
3.62 MB
Created
18/01/2024 12:20 WIB
Photographer
Ari Bowo Sucipto
Editor