PHM level oil production with Becapai Artificial Elevator

  • 28th March 2024 GMT+7
PHM level oil production with Becapai Artificial Elevator
Hulu Mahakam Pertamina Employees monitor the Becapai Artificial Elevator project at the offshore of the Becapai field from the barge at East Kalimantan, Wednesday (27/3/2024). PT Pertamina Hulu Mahakam (PHM) developed the Becapai field that has been aged 50 years through the Becapai Artificial Elevator project by implementing innovation and technology to increase the added production of oil reaches 2,000 barrels of oil per day (BOPD). ANTARA PHOTO/Hafidz Mubarak A/tom.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5000x3333
File size
2.97 MB
Created
28/03/2024 15:05 WIB
Photographer
Hafidz Mubarak A
Editor
Rahmadi Rekotomo