The mud flow at Gilimanuk Bali Port
The cyclists of the antre motor enter the ship on H-5 Edul Fitri 1445 H in the dock of Gilimanuk Port, Jembrana, Bali, Friday (5/4/2024). Peak 2024 Lebaran mud flow through Gilimanuk Port, Bali to Ketapang Port, East Java is estimated to occur on Saturday (6/4) to Sunday (7/4). ANTARA PHOTO/Nyoman Hendra Wibowo/aww.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.