Wide mud flow at Rajabasa Terminal
A Rajabasa, Bandar Lampung, Lampung, Friday (5/4/2024). Entering H-5 widths 2024, monitored there is no increase in the angular from Java island and estimated peaks of the mud flow at the A Rajabasa Type Terminal will occur on 7-8 April 2024. ANTARA PHOTO/Ardiansyah/aww.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.