Power supply Java Mature Bali on Width 2024

  • 6th April 2024 WIB
Power supply Java Mature Bali on Width 2024
The complex atmosphere of Paiton PLTU in Probolinggo, East Java, Friday (5/4/2024) night. PLN maintains an installed capacity of 21 gigawatts of a total capacity of 45 gigawatts to guarantee electricity supply in the Java, Madura, and Bali area during the 1445 Mitigation Eid. ANTARA PHOTO/Rizal Hanafi/nz

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5000x3334
File size
1.84 MB
Created
06/04/2024 10:00 WIB
Photographer
Rizal Hanafi
Editor
Zarqoni Maksum