Swim track to Bengkulu armg

  • 6th April 2024 GMT+7
Swim track to Bengkulu armg
A number of vehicles across the toll gate Bengkulu street Tol Trans Sumatra Ruas Lubuklinggau-Bengkulu sexy I Bengkulu-Taba Visitor in Bengkulu City, Bengkulu, Saturday (6/4/2024). Entering the H-4 Hari Raya Edul Fitri 1445 Hijriah, the landing path towards the City of Bengkulu is still armg with the volume of vehicles since H-7 to date as much as 4.183 vehicles and predicted increased by 20 percent at the upcoming H-2 compared to the peak of the mudic current in the previous year’s width. ANTARA PHOTO/Muhammad Izfaldi/Spt.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5188x3446
File size
3.24 MB
Created
06/04/2024 19:55 WIB
Photographer
Muhammad Izfaldi
Editor
Saptono