KELOK-9
PAYAKUMBUH, 25/5 - KELOK-9, Two heavy tools get rid of the mixed soil material for the manufacture of 9th new roads in Payakumbuh Area, Kab. Five Ten City, Sumbar, Friday (25/5). The 9th Bridge that connects the Sumbar Propinsi - Riau with a 2.5 km long, the development of the funds around Rp 550 billion and was estimated to be completed December 2012. ANTARA/Maril Gafur/mes/12
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.