Capacity of Javanese-1

  • 16th July 2024 GMT+7
Capacity of Javanese-1
A manpowered in the Uap Gas Power Plant area (PLTGU) Java-1, Cilamaya, Karawang, West Java, Tuesday (16/7/2024). Java-1 PLTGU located in Java-Bali’s electricity load center is an integrated power plant with Floating Storage Regasification Unit (FSRU) with an installed capacity of 1.760 megawatt. ANTARA PHOTO/Aprillio Akbar

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2661
File size
743.68 KB
Created
16/07/2024 20:20 WIB
Photographer
Aprillio Akbar
Editor