Trial bin processing in Cibitung
A number of operators accommodate the results of plastic waste that has been reserved to be dried when the TPST trial (Integrated Waste Processing) Kertamukti in Cibitung, Bekasi District, West Java, Wednesday (31/7/2024). TPST with an area of 6,000 square meters is planned to process 50 tons of trash per day into the alternative fuel of RDF and MDU (Material Recycling) to reduce the buildup of waste in the Burangkeng End Disposal. ANTARA PHOTO/Fakhri Hermansyah/aww.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.