INSTALL BRIDGE
MERAK 18/6 - WARRANTIES. A number of workers install brike mobiable bridge (MB) or vehicle connecting tools to the deck on the roro boat on the dock 2 Merak Port, Banten, Monday (18/6). The installation of the tool marks the completion of the Dermaga 2 repair process and is immediately operated to the congestion in Merak is expected to be top. PHOTO ANTARA/Asep Fathulrahman/Koz/Spt/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.