CONTACT
BANDUNG, 4/7 - SAGULING Saguling reservoir looks from the top that holds water to operate the Water Power Plant (PLTA) Saguling, West Bandung, Bandung, Wednesday (4/7). PLTA Saguling manufactures 700 MW electricity used to support Java-Bali electrical system. ANTARA/Rosa Panggabean/ama/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.