TRAIN INKA

  • 19th July 2012 GMT+7
TRAIN INKA
MADIUN, 19/7 Ð KA SUDAH JADI. Head of Railway Industry Humas (Inka) Fathor Rasid shows the Railway (KA) economy class (K3) is air-conditioned that has been in the train factory PT Inka Madiun, Jatim, Thursday (19/7). Currently PT Inka is working on the manufacture of 30 trains (3 circuits) K3 air-conditioned to meet the demand of PT Railway Indonesia (KAI) in the transportation of mudic current and back width, which is the workmanship reached about 80 percent and in the near future will be done test run. PHOTO ANTARA/Siswowidodo/NZ/12.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2056
File size
322.93 KB
Created
19/07/2012 17:55 WIB
Photographer
Siswowidodo
Editor