RAILWAY EXAMINATION
SOLO, 1/8 - KERETA ENGINEERING. A police showed copot nuts and bolts when performing the rail breakdown on the mudning path preparation operations in Solo, Jateng, Wednesday (1/8). Check the readiness of the mudic path to anticipate and minimize the occurrence of railway travel disorders. ANTARA/Akbar Nugroho Gumay/Koz/Spt/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.