CONSTRUCTION OF JATIKARA RESERVOIR
SEMARANG, 29/8 - BUDUK BUFFER DEVELOPMENT. A number of trucks and heavy equipments conduct soil dredging at the location of the East Java Waduk building project, in Semarang, Jateng, Wednesday (29/8). The development of reservoirs will be working as a water resource manager and integrated flood controller was built at a cost of Rp1.6 trillion was targeted to be completed in early 2014. ANTARA/R. Rekotomo/Koz/Spt/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.