REPAIR RAIL CA

  • 3rd September 2012 GMT+7
REPAIR RAIL CA
SERANG, 3/9 - REL PRODUCES. A number of workers repairing the railway bearings on the Serang-Anyer line, Lama Banten Station, Serang, Monday (3/9). PT KAI continues to repair the post peak of the mud flow and the backflow of the width so that it does not interfere with the schedule of travel. PHOTO ANTARA/Asep Fathulrahman/Koz/Spt/12.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4200x2928
File size
2 MB
Created
03/09/2012 14:25 WIB
Photographer
Asep Fathulrahman
Editor