POWER SUPPLY DOWN

  • 4th September 2012 GMT+7
POWER SUPPLY DOWN
BANYU, 4/9 - TURUN ELECTRIC VEHICLE. A number of workers conduct maintenance and repair of power generators in Ketenger PLTA, Baturraden, Banyumas, Jateng, Tuesday (4/9). The electricity supply of all PLTAs in Central Java decreases, from the total capacity of 299,4 megawatts to only stay 88.4 megawatts, as a result of reduced water discharge due to dryness. ANTARA/Idhad Zakaria/ed/mes/12.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3216x2136
File size
880.11 KB
Created
04/09/2012 16:00 WIB
Photographer
Idhad Zakaria
Editor