ROAD REPAIR BREAK.

  • 10th February 2008 WIB
ROAD REPAIR BREAK.
SITUBONDO,10/2 - PUTUS PRODUCES. A truck poured the cirtu to fix the road body at the end of the Parenge'an bridge which is a large bandang flooder in Kilensari Village, Panarukan Observation, Situbondo, East Java Sunday (10/2). The road repair that decides the pantura path to Banyuwangi and Bali takes about a week. ANTARA/Hadiyanto/s/hp/08

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2048x1357
File size
356.34 KB
Created
10/02/2008 10:21 WIB
Photographer
Hadiyanto
Editor