ROAD REPAIR BREAK.
SITUBONDO,10/2 - PUTUS PRODUCES. A truck poured the cirtu to fix the road body at the end of the Parenge'an bridge which is a large bandang flooder in Kilensari Village, Panarukan Observation, Situbondo, East Java Sunday (10/2). The road repair that decides the pantura path to Banyuwangi and Bali takes about a week. ANTARA/Hadiyanto/s/hp/08
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.