SIPHON TIME CROSS

  • 3rd November 2012 GMT+7
SIPHON TIME CROSS
APP, 3/1 - SIPHON KALI MALANG. The construction of Siphon Kali Malang, in the damung Kali Malang area, Bekasi, Saturday (3/11). The Siphon’s development fee that separates the flow of Bekasi’s Times through the top and the Malang Times through the bottom is fully covered by the Ministry of Public Works with a budget of Rp21,8 billion. ANTARA/Paramayuda/ama/12

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1937
File size
802.68 KB
Created
03/11/2012 16:30 WIB
Photographer
Paramayuda
Editor