PERCEPAT REl
BOGOR, 23/11 - PERCEPAT PROFESSIONAL REL. A heavy tool is used to clean the location of the longsor before the installation of turf in the repair of the longsor rails in Cilebut, Bogor, Jabar, Friday (23/11). PT Kereta Api Indonesia strives for one KRL rail line has been able to be used alternately from the direction of Jakarta and Bogor in the future period while one of the damaged railway lines targeted can be used at least 20 days of the future. ANTARA/Jafkhairi/Koz/Spt/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.