SOLAR PILAH.

  • 23rd February 2008 GMT+7
SOLAR PILAH.
MAKASSAR, 23/2 - PILAH SOLAR. A bocah sorts of water-mixed solar from the spill of fuel distribution pipes of Steam Power Plant (PLTU) Tello belongs to PT. PLN IX Sulsel leaked in Makassar Barawaja Village, Saturday (23/3). Due to the leakage of the pipe, PT PLN loses hundreds of tons of solar that also pollutes the locals environment. ANTARA/Yusran Uccang/Koz/ama/08.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
1329x2048
File size
303.66 KB
Created
23/02/2008 14:18 WIB
Photographer
Yusran Uccang
Editor