PIPE MESH

  • 25th February 2008 GMT+7
PIPE MESH
SIDOARJO, 25/2 - JEBOL PIPE. Some workers repair the PDAM pipe, on Jl Raya Porong Sidoarjo, Monday (25/2). The 45Cm diameter pipe is trapped at the previous night due to a decrease in soil related to the smelting of Lapindo mud. Thousands of PDAM customers difficulty getting clean water supply. PHOTO:ANTARA/Eric Ireng/Koz/nz/08.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
1365x2048
File size
421.73 KB
Created
25/02/2008 15:47 WIB
Photographer
Eric Ireng
Editor