REPAIR OF CRL ELECTRICAL NETWORKS.
BOGOR, 10/12-PRODUCED NETWORK. A number of workers repair the KRL electrical network at the Cilebut, Bogor, Jabar, Monday (10/12). The repair of electrical networks and reinstallation of rails that have been disconnected due to the longsor to accelerate the re-operation of two KRL Jakarta-Bogor lines and vice versa PHOTO ANTARA/Jafkhairi/s/12
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.