NORMALIZING CURANJI ROD
STEP, 11/12 - NORMALIS BATANGJI. A number of workers install bronjong on unmovable rocks in the river stream of Kuranji, Padang, Sumbar, Monday (10/12). The normalization of the river stream of Kuranji Rod is carried out with the dredging sediments present in the river stream and moved to the riverside so that the maximum flow is weighed by installing the bronjong wire to strengthen the river lips. PHOTO ANTARA/Iggoy el Fitra/Koz/nz/12.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.