OIL PROCESSING CENTER

  • 16th February 2013 GMT+7
OIL PROCESSING CENTER
TUBAN, 16/2 - MISSION CENTER. A worker is located at the oil processing location or "Central Processing Area (CPA)" in Rahayu Village, Soko District, Tuban, Jatim, Saturday (16/2). "CPA" managed "Joint Operating Body (JOB) Pertamina-Petrochina Eas Java (PPEJ) it capacity reaches 80 thousand barrels, utilized holding production of Sukowati field oil and Bojonegoro Cepu Block. ANTARA/Aguk Sudarmojo/Koz/ama//13.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2592x1944
File size
383.22 KB
Created
16/02/2013 16:30 WIB
Photographer
Aguk Sudarmojo
Editor