PIT DIAMETER
TALIWANG, 28/2 - DIAMETER PIT. A journalist takes an image of an open Green Stone pit belonging to PT. Newmont Nusa Tenggara in Sekongkang District, Taliwang, West Sumbawa District, NTB, Thursday (28/2). The current green stone mine Pit enters the phase 6 has a diameter along 1.4 km with a depth of -240 mdpl. ANTARA/Ahmad Subaidi/Koz/mes/13.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.