TOLL DRILL

  • 4th April 2013 GMT+7
TOLL DRILL
BOGOR, 4/4-PENGE TOL BORR TOL. A number of vehicles crossing side road poles toll Bogor Outer Ring Road (BORR) sexy 2A (Kedunghalang-Kedungbadak) in Kedunghalang, Bogor City, Jabar, Thursday (4/4). The 2A toll road construction is targeted at the beginning of 2014 which can shorten the time of the rider to Jakarta. ANTARA/Jafkhairi/ed/nz/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3008x2000
File size
491.95 KB
Created
04/04/2013 21:30 WIB
Photographer
Jafkhairi
Editor