ADDITION TO CRL CARRIAGE

  • 20th April 2013 GMT+7
ADDITION TO CRL CARRIAGE
DEPOK, 20/4 - IMPORTANT GERBONG KRL. A officer runs between the KRL gerbong circuit in Depo KRL Depok, Jabar, Saturday (20/4). PT KAI Commuter Jabodetabek will add 180 carriages of Commuter Line in mid 2013 in connection with the stop of the operation of non-AC economic train and replace it with KRL AC from June 2013. PHOTO ANTARA/Andika Wahyu/ama/13.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2400x1563
File size
826.83 KB
Created
20/04/2013 16:45 WIB
Photographer
Andika Wahyu
Editor