GAS PRODUCTION

  • 7th June 2013 GMT+7
GAS PRODUCTION
Two workers do the installation process of gas pressure controller in the drilling location of the North Central Java gas well (NCJ) A4, in the Semarang Mangkang Kulon Village, Jateng, Friday (7/6). The drilling performed by Pertamina EP with a depth target of up to 1.560 meters is expected to produce gas by 2 million standard feet cubic gas per day (MMSCFD). ANTARA PHOTO/R. Rekotomo/Koz/pd/13.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3076x1997
File size
824.51 KB
Created
07/06/2013 18:51 WIB
Photographer
R. Rekotomo
Editor