ETAPE SIX
A number of trees crosses under the city’s Fly Overbound Bridge, on the six Tour de Singkarak 2013 etape in Padangpariaman, Sumbar, Saturday (8/6). Sixth stage with a 144.5 kilometers Pariaman-Painan route. ANTARA PHOTO/Iggoy el Fitra/Koz/mes/13.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.