THE READINESS OF THE HOLY PANTURA ROAD

  • 24th July 2013 GMT+7
THE READINESS OF THE HOLY PANTURA ROAD
The Holy Trinity AKBP Bambang Murdoko (left) saw the condition of the Pantura road concrete that connects the Holy-Pati when the climb of road readiness in Jati, Holy, Jateng, Wednesday (24/7). The newly dibetoned Holy Circle Road needs to be equipped with safety due to the height between the road body with different road shoulders about 40-60 cm so that it harms the road users. ANTARA PHOTO/ Andreas Fitri Atmoko/s/Spt/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3872x2592
File size
924.55 KB
Created
24/07/2013 17:30 WIB
Photographer
Andreas Fitri Atmoko
Editor