THE BRAZING BRIDGE STARTS DISMANTLING

  • 9th September 2013 WIB
THE BRAZING BRIDGE STARTS DISMANTLING
A number of workers complete the repair of the Divine Bridge on the pantura line, Brebes, Jateng, Monday (9/9). Jakarta’s connecting bridge to Central Java located on the pantura line began to be dismantled and replaced from using steel plate into concrete plate, which takes 2 months of workmanship. ANTARA PHOTO/Oky Lukmansyah/s/ama/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3600x2363
File size
1.51 MB
Created
09/09/2013 17:55 WIB
Photographer
Oky Lukmansyah
Editor