READY TO OPERATE

  • 10th October 2013 GMT+7
READY TO OPERATE
A number of garbage planting trucks at End Disposal (TPA) Wireuna built on cooperation with the Swedish country as a pilot of waste processing that produces methanol gas in Palu, Central Sulawesi, Thursday (10/10). The government of the Palu city targets ready to operate the power plant engines with biogas powers of cooperation with the Swedish government in TPA Wireuna in early January 2014. The targeted power generation will be able to serve 2,500 houses with a power of 1,300 watts each home. ANTARA PHOTO/Mohamad Hamzah/s/pd/13.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4288x2848
File size
1.58 MB
Created
10/10/2013 18:05 WIB
Photographer
Segera Beroperasi
Editor