AMINE LNG REGASIFICATION PROJECT
Director of Karyuliarto Day Pertamina (left) hand-sounded by Dirut Engineering Industry Mochammad Ali Suharsono when laying the first stone stage reconstruction project of the Arun LNG regasification terminal in Lhokseumawe, Aceh, Saturday (9/11). Pertamina through subsidiary PT Perta Arun Gas allocated 570 million US dollars for the LNG regasification terminal project 405 mmSCFD lie the construction of Arun-B gas pipe by synergizing seven BUMN and one BUMD and the terminal is targeted to operate on October 2014. ANTARA PHOTO/Wahyu Putro A/s/ama/13
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.