BUY ELECTRIC POWER

  • 3 Desember 2013 18:40 WIB
BUY ELECTRIC POWER
The President of PLN, Nur Pamudji (right) and President of BP Regional Asia Pacific, William Li (left) was held after signing the Electrical Power Determination and Retrieving Agreement with the Tangguh KKS Contractor meets the needs in Bintuni Bay and surrounding areas, at PLN Central PLN Office, Jakarta, Tuesday (3/12). In the agreement agreed on both parties, the KKS Tangguh Contractor will send 8 MW electricity to the Northern Bintuni area and South Bintuni, West Papua. The electricity from Tangguh is broadcasted through the underground cable electrical network along 30 kilometers which is then broadcasted to the PLN’s main power network to be channeled to the customer. ANTARA PHOTO/Agus Trimukti/s/pd/HO/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3102x2099
File size
1.21 MB
Created
03/12/2013 18:40 WIB
Photographer
Agus Trimukti
Editor