FIX ELECTRIC FLOW

  • 10th December 2013 GMT+7
FIX ELECTRIC FLOW
Workers repair the Top Flow Electric (LAA) in the bustling of the Ulujami railway, Bintaro, South Jakarta, Tuesday (10/12). PT KAI must replace the Top Flow Electric Cable along 1500 meters because it has been burned by car accidents with fuel carrier trucks. ANTARA PHOTO/Muhammad Iqbal/ed/mes/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2144x3260
File size
1.01 MB
Created
10/12/2013 15:20 WIB
Photographer
Muhammad Iqbal
Editor