ELECTRIC BRICK PRODUCTION

  • 28th December 2013 GMT+7
ELECTRIC BRICK PRODUCTION
A officer checked generator facilities in Gas Power Plant (PLTG) Panaran, Batam, Saturday (28/12). Bright PLN Batam is currently capable of supplying electricity requirements of 392 MW with a peak load of 310 MW, the fuel power plant is 70 percent using gas and 30 percent using coal. ANTARA PHOTO/Wahyu Putro A/s/ama/13

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3745x2492
File size
1.2 MB
Created
28/12/2013 17:30 WIB
Photographer
Wahyu Putro A
Editor