ELECTRIC BRICK PRODUCTION
A officer conducts supervision of generator facilities in Gas Power Plant (PLTG) Panaran, Batam, Saturday (28/12). Bright PLN Batam is currently capable of supplying electricity requirements of 392 MW with a peak load of 310 MW, the fuel power plant is 70 percent using gas and 30 percent using coal. ANTARA PHOTO/Wahyu Putro A/ama/s/13
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.