TRADITIONAL OIL MINER
The traditional miner is pouring crude oil using the iron team in Hargomulyo Village, Kedewan, Bojonegoro Regency, Jatim, Sunday (29/12). The amount of wells produced an average of 180 wells per day with a 10 drum per well result, where the production result is besides deposited to Pertamina Cepu, Jateng, also there are about 30 percent dissolved then sold in a form of solar freely. ANTARA PHOTO Aguk Sudarmojo/ed/Spt/13
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.