BRIDGE REPAIR

  • 21st January 2014 GMT+7
BRIDGE REPAIR
A number of workers repair the Siak Bridge III, in Pekanbaru, Tuesday (21/1). Riau’s proxies were forced to close a new bridge that was one year to be fixed because the contractors did construction errors that weaken the power of the bridge. ANTARA PHOTO/FB Anggoro/ed/pd/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1993
File size
1.42 MB
Created
21/01/2014 21:25 WIB
Photographer
Fb Anggoro
Editor