RECOVERY POST ERUPSI
A worker checks the control panel of the vertical hydraulic turbines of the caplan groom is cleaned from the volcanic dust of Kelud mountains in the Java Generation of Bali - Selorejo PLTA, Ngantang, Malang, East Java, Friday (21/2). A number of recovery is carried out in the PLTA that is able to generate 4,5 Mega Watt electricity per day to re-operate the mountain of Kelud. ANTARA PHOTO/Ari Bowo Holypto/s/ama/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.