SOFT LAUNCHING BRICK ELECTRICAL PROJECT

  • 1st March 2014 WIB
SOFT LAUNCHING BRICK ELECTRICAL PROJECT
Governor Kepri HM Sani (left) Wamen ESDM Susilo Siswoutomo (center) reviewing the plan of Steam Gas Power Generation (PLTGU) from PTPP officials when the inauguration of Batam's electricity projects in Tanjung Uncang, Batam, Saturday (1/3). PLTGU consists of two 2X42,5 MW capacity plants belonging to PLN Batam and 2X35 MW belongs to Independent Power Producer (IPP) scheduled operating at the end of 2014, the generator will be powered by gas from Natuna through the underwater pipeline. ANTARA PHOTO/Joko Sulistyo/ed/NZ/14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2048x1396
File size
1.76 MB
Created
01/03/2014 13:30 WIB
Photographer
Joko Sulistyo
Editor