PLTU PAITON PROBOLINGGO
Photos from air, PLTU Paiton Probolinggo, Jatim, Monday (12/5). The operation of Paiton’s PLTU is great benefit to electrical supplies in Probolinggo Regency, with an power capacity of 89.25 MW while the peak load is 62.39 MW so surplus 26,86 MW. ANTARA PHOTO/Eric Ireng/Asf/Spt/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.