PRE CONSTRUCTION BRIDGE MUSI
A number of team members conduct depth surveys and river water advances by using "echosounder" in Musi River ban, Palembang, Sumsel, Wednesday (13/5). The survey is a pre-development survey of Musi IV bridge projected to reduce Ampera bridge load. ANTARA PHOTO/ Feny Selly/ed/mes/14
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.