FLY OVER HIGH HILL CONSTRUCTION

  • 9th June 2014 GMT+7
FLY OVER HIGH HILL CONSTRUCTION
A number of workers do the work of building concrete poles of Fly Over Bridge on the road bypass Aur Kuning, Bukittinggi, Sumbar, Monday (9/6). Fly Over Bridge with a length of 675 meters that cost about Rp 130 billion is built through the APBN fund and expected to cope with congestion in the city. ANTARA PHOTO/Iggoy el Fitra/s/Spt/14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1840
File size
1.07 MB
Created
09/06/2014 20:15 WIB
Photographer
Iggoy El Fitra
Editor